Site MapHelpFeedbackOnline Quizzing
Online Quizzing
(See related pages)



1

A departmental load report is one of the primary reports of an MRP system.
A)True
B)False
2

MRP is used for batch processing.
A)True
B)False
3

Because of the pyramid relationship for all components in an MRP system, it is appropriate to provide safety stocks at all levels, since this would help to reduce the setup costs.
A)True
B)False
4

An inventory record file is maintained in MRP for every raw material, component, assembly, subassembly or end item.
A)True
B)False
5

An MRP worksheet shows all the various requirements on hand, planned releases and planned receipts for every item and for every time bucket covered by the current master schedule.
A)True
B)False
6

ERP involves an effort to standardize record keeping.
A)True
B)False
7

ERP is basically planning software for an enterprise.
A)True
B)False
8

The principal files that are incorporated into a computerized MRP system are:
A)inventory record, master schedule, BOM, MRP computer program.
B)inventory record, master file, part-period balancing program.
C)end items, components, and load reports.
D)capacity requirements planning file, master schedule, inventory record.
E)MRP computer program, master schedule, capacity requirements planning file.
9

Which one of these would not be a possible lot size?
A)EOQ.
B)Gross requirements.
C)Net requirements.
D)An amount less than net requirements.
E)All are possible lot sizes.
10

A list of all parts and materials needed to assemble one unit of a product is called:
A)a master schedule.
B)a kanban.
C)an inventory record file.
D)MRP.
E)a bill of materials.
11

Which phrase or term is most clearly associated with the acronym BOM?
A)Master schedule
B)Net requirements
C)Scheduled receipts
D)Product-structure tree
E)Inventory record file
12

Periodic updating of an MRP system to account for all changes which have occurred within a given time interval is called:
A)pegging
B)planned order release
C)net change
D)regenerative
E)exception report
13

The major reason(s) companies undertake MRP is/are:

#1 to integrate financial data
#2 to standardize manufacturing processes
#3 to standardize HR information
A)#1 only
B)#2 only
C)#3 only
D)#1 and #2
E)#1, #2, and #3







Stevenson OM7Online Learning Center with Powerweb

Home > Chapter 15 > Self Quiz from CD