Activities | Project steps that consume resources and/or time.
|
|
|
|
Activity-on-arrow (AOA) | Network diagram convention in which arrows designate activities.
|
|
|
|
Activity-on-node (AON) | Network diagram convention in which nodes designate activities.
|
|
|
|
Beta distribution | Used to describe the inherent variability in activity time estimates.
|
|
|
|
CPM | Critical path method, for planning and coordinating large projects.
|
|
|
|
Crash | Shortening activity durations.
|
|
|
|
Critical activities | Activities on the critical path.
|
|
|
|
Critical path | The longest path; determines expected project duration.
|
|
|
|
Deterministic | Time estimates that are fairly certain.
|
|
|
|
Events | The starting and finishing of activities, designated by nodes in the AOA convention.
|
|
|
|
Independence | Assumption that path duration times are independent of each other; requiring that activity times be independent, and that each activity is on only one path.
|
|
|
|
Most likely time | The most probable length of time that will be required.
|
|
|
|
Network (precedence) diagram | Diagram of project activities that shows sequential relationships by use of arrows and nodes.
|
|
|
|
Optimistic time | The length of time required under optimal conditions.
|
|
|
|
Path | A sequence of activities that leads from the starting node to the finishing node.
|
|
|
|
PERT | Program evaluation and review technique, for planning and coordinating large projects.
|
|
|
|
Pessimistic time | The length of time required under the worst conditions.
|
|
|
|
Probabilistic | Estimates of times that allow for variation.
|
|
|
|
Project champion | A person who promotes and supports a project.
|
|
|
|
Projects | Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame.
|
|
|
|
Slack | Allowable slippage for a path; the difference between the length of a path and the length of the critical path.
|
|
|
|
Virtual project teams | Some or all of the team members are geographically separated.
|
|
|
|
Work breakdown structure (WBS) | A hierarchical listing of what must be done during a project.
|