1 | | Which of the following is not a reason for using a model? |
| | A) | A model is quicker and easier to build than the real thing. |
| | B) | We can use a model in simulations to test our ideas. |
| | C) | We can use a model instead of building the real thing. |
|
|
|
2 | | Which of the following is not a model? |
| | A) | An Airbus 380. |
| | B) | A scale model of an Airbus 380 to use in a wind tunnel. |
| | C) | An engineer’s drawing of a cross-section through the fuselage of an Airbus 380. |
|
|
|
3 | | Analysts and designers use models that consist of which of the following? |
| | A) | Diagrams and text. |
| | B) | Only diagrams. |
| | C) | Only text. |
|
|
|
4 | | Which of the following do analysts and designers use diagrams for? |
| | A) | To communicate ideas. |
| | B) | To understand structures and relationships. |
| | C) | Both 1 and 2. |
|
|
|
5 | | Why are systems analysis and design diagram standards important? |
| | A) | They promote communication between team members. |
| | B) | They provide work for international standards committees. |
| | C) | They prevent systems analysts’ clothes from shrinking in the wash. |
|
|
|
6 | | Which of the following are the rules that modelling techniques should enforce? |
| | A) | Simplicity of representation, external consistency, completeness and network representation. |
| | B) | Simplicity of representation, internal consistency, completeness and hierarchical representation. |
| | C) | Simplicity, internal consistency, completeness and hierarchical symbols. |
|
|
|
7 | | Which of the following is true? |
| | A) | Icons can contain two-dimensional symbols. |
| | B) | Two-dimensional symbols can contain icons. |
| | C) | An icon contains at least one vertex and one string. |
|
|
|
8 | | Which of the following is true? |
| | A) | A model consists of one and only one diagram. |
| | B) | A diagram contains at least one model. |
| | C) | A model contains diagrams. |
|
|
|
9 | | As a model is developed it, which of the following does it become? |
| | A) | More abstract. |
| | B) | More detailed. |
| | C) | Less formal. |
|
|
|
10 | | Which of the following is not a purpose for using activity diagrams? |
| | A) | To show the subsystems that make up a system. |
| | B) | To model a task. |
| | C) | To describe the logic of an operation. |
|
|
|
11 | | A decision node in an activity diagram is represented by which of the following? |
| | A) | A black circle in a white circle with a black border. |
| | B) | A diamond. |
| | C) | A rectangle. |
|
|
|
12 | | Which of the following is shown by a statement in square brackets such as ‘[no staff to assign]’ alongside a control flow? |
| | A) | An activity. |
| | B) | An event. |
| | C) | A guard condition. |
|
|
|
13 | | Which of the following is the name given to the division of an activity diagram into columns that represent where activities take place? |
| | A) | Tracks. |
| | B) | Activity zones. |
| | C) | Activity partitions. |
|
|
|
14 | | How many phases are there in the Unified Software Development Process? |
| | A) | Three. |
| | B) | Four. |
| | C) | Five. |
|
|
|
15 | | Which of the following are the phases of the Unified Software Development Process? |
| | A) | Inception, elaboration, implementation, test. |
| | B) | Analysis, design, implementation, test. |
| | C) | Inception, elaboration, construction, transition. |
|
|
|
16 | | Which of the following is a definition of a workflow in the Unified Software Development Process? |
| | A) | A series of activities to be carried out and the roles of the people who will carry out those activities. |
| | B) | A series of stages and the techniques that will be used in those stages. |
| | C) | A series of products and the roles of the people who will produce those products. |
|
|
|
17 | | Which of the following is the UML notation for a model? |
| | A) | Answer A (0.0K)Answer A |
| | B) | Answer B (0.0K)Answer B |
| | C) | Answer C (0.0K)Answer C |
|
|
|
18 | |
Which of the following does the Figure below show? Image (0.0K)Image |
| | A) | A model. |
| | B) | A sub-system |
| | C) | A package |
|
|
|
19 | |
Which of the following does the figure below show? Image (7.0K)Image |
| | A) | Two actions joined by a control flow. |
| | B) | Two control flows joined by an activity. |
| | C) | Two actors joined by a control flow. |
|
|
|
20 | |
What is shown by the arrows from the rectangles in the following diagram? Image (13.0K)Image |
| | A) | Object flows. |
| | B) | Data stores. |
| | C) | Classes. |
|
|