assignment method | a linear programming model for the optimal allocation of resources to tasks.
|
|
|
|
backward scheduling | scheduling by working backwards in time from the due date(s).
|
|
|
|
CR (critical ratio) | the ratio of the time remaining to the due date to the processing time for a job; the job with the smallest ratio is processed first.
|
|
|
|
EDD (earliest due date) | jobs are processed according to the due date, the earliest due date first.
|
|
|
|
FCFS (first come first served) | jobs are processed in the order in which they arrive at a machine or work center.
|
|
|
|
finite loading | jobs are assigned to work centers taking into account the work center capacity and job processing times.
|
|
|
|
flow-shop scheduling | scheduling for flow systems.
|
|
|
|
flow system | a high volume system with standardized equipment and activities.
|
|
|
|
forward scheduling | scheduling ahead from some point in time.
|
|
|
|
Gantt chart | a chart used as a visual aid for loading and scheduling purposes.
|
|
|
|
high-volume systems | organizations or production systems with standardized equipment and activities that provide highly similar products or services.
|
|
|
|
horizontal loading | loading the job with the highest priority on all work centers followed by the job with the next highest priority, and so forth.
|
|
|
|
Hungarian method | a method of assigning jobs on a one-to-one basis to machines or employees to identify the lowest cost solution.
|
|
|
|
infinite loading | jobs are assigned to work centers without regard for the capacity of the work center.
|
|
|
|
input/output (I/O) control | managing workflows and queues at work centers.
|
|
|
|
intermediate-volume systems | production systems with volume lower than that of a high volume system, but with production quantities greater than those of a job shop.
|
|
|
|
job shop | diverse products are made to order and jobs flow through the system in batches.
|
|
|
|
job shop scheduling | scheduling for low volume systems with many variations in requirements.
|
|
|
|
job time | the time needed for the setup and processing of a job.
|
|
|
|
Johnson's rule | a technique for minimizing the makespan for a group of jobs to be processed on two machines or at two work centers.
|
|
|
|
load chart | a form of Gantt chart that shows both the loading and idle times of a set of machines or departments.
|
|
|
|
loading | assigning jobs to work centers.
|
|
|
|
makespan | the total time needed to complete a group of jobs from the beginning of the first job to the completion of the last job.
|
|
|
|
priority rules | heuristics used to select the order in which the jobs will be processed.
|
|
|
|
schedule chart | a form of Gantt chart that shows the orders or jobs in progress and whether they are on schedule.
|
|
|
|
scheduling | establishing the timing of the use of equipment, facilities and human activities in an organization.
|
|
|
|
sequencing | determining job processing order.
|
|
|
|
slack | the difference in time between the completion date and the scheduled due date.
|
|
|
|
SPT (shortest processing time) | jobs are processed according to their processing times at a machine or work center, with the shortest times first.
|
|
|
|
vertical loading | the finite loading of jobs at a work center, one by one, according to some priority rule.
|
|
|
|
workstation | an area where one person works, usually with special equipment, on a specialized job.
|