1

At the ____ maturity level of the CMM, the software process is ad hoc or unplanned.
A)defined
B)initial
C)managed
D)optimizing
2

Procedures for tracking and maintaining data relative to each configuration item in the baseline are included in configuration ____.
A)auditing
B)control
C)identification
D)status accounting
3

At the ____ maturity level of the CMM, the software process is standardized and documented.
A)defined
B)initial
C)managed
D)optimizing
4

At the ____ maturity level of the CMM, the software process is structured enough that success with one project can be repeated for another similar project.
A)defined
B)managed
C)optimizing
D)repeatable
5

In the ____ maturity level of the CMM, various aspects of the software process and products are measured and evaluated.
A)defined
B)initial
C)managed
D)repeatable
6

An organization at CMM level ____ has no formal change management processes in place.
A)1
B)2
C)3
D)5
7

Which of the following documents is used to track changes through the CCB?
A)AUP
B)BCP
C)DRP
D)SPR
8

The assets identified during configuration identification are called ____.
A)baselines
B)configuration audits
C)configuration items
D)software problem reports
9

As per the ____ principle, database administrators should NOT be program developers on database systems they administer.
A)Due care
B)Least privilege
C)Need to know
D)Segregation of duties
10

Which of the following utilities ensures the integrity of the executable code?
A)Anti-virus software
B)Host-based IDS
C)Network-based IDS
D)Switch