allowance | When constructing a time standard using a stopwatch time study or predetermined motion times, the addition of time to the standard for personal, restroom, and other time.
|
|
|
|
contingent workers | Temporary workers employed by an agency and contracted to work for another firm.
|
|
|
|
continuous improvement | A process of always seeking ways to improve existing processes and tasks.
|
|
|
|
cross-training | Training employees to do a variety of jobs.
|
|
|
|
innovation | A dramatic change from a new idea.
|
|
|
|
learning curve | A curve that shows the reduction in the time it takes to complete a task as the number of times it has been completed increases.
|
|
|
|
learning rate | The amount of improvement obtained as a task is repeated.
|
|
|
|
normal time | In a time study, this is the observed time after adjustment by the performance rating.
|
|
|
|
observed time | When performing a time study, this is the average of the times of observations.
|
|
|
|
performance rating | When performing time studies, this is an adjustment made to take into account whether the observed worker was faster or slower than normal.
|
|
|
|
predetermined motion time | The time required to complete small aspects of tasks collected from a large number of observations and stored in a database so that future time standards can be created without needing a stopwatch time study.
|
|
|
|
service–profit chain | A framework used to link employee satisfaction to profitability.
|
|
|
|
standard time | The result of a stopwatch time study after an adjustment by the performance rating and after allowances have been made.
|
|
|
|
stopwatch time study | The process of developing a time standard by actually observing and timing workers.
|
|
|
|
time standard | The expected time for a worker to complete a task.
|
|
|
|
work sampling | A process of recording what a worker is doing to determine how employee time is spent.
|